      Chasing presses refer to closed presses with frame stanina.

      Outdated designs of presses have a composite cast frame: a table, racks and an upper traverse; new models of small and medium sizes – an all-welded frame.

      In large presses, the wall is welded composite and tightened with bolts.

      A distinctive feature of minting presses is the crank-knee execution of the main mechanism, providing kinematic and dynamic properties that are necessary for operations with a small working stroke and a very significant deforming force.

      Dismantling of the minting press

      Dismantling of the minting press

      Measures to dismantle the minting press include such types of work:

      • Carrying out dismantling works on equipment;
      • Dismantling work on the foundation of the device;
      • Packaging and preservation of individual units and systems of minting press;
      • Moving with the help of special rigging devices and loading equipment on the vehicle (low-feed platform, car trailer, railway transporter, etc.);
      • Transportation of the minting press to the installation site;
      • Carrying out unloading works of the minting press at the delivery point and redeploying it using the rigging press to the assembly point.
      • Installation of the coinage press.
      This is how the minting press is dismantled.

      rigging

      rigging

      In terms of the volume of activities performed, rigging and transportation of minting presses is a movement belonging to the category of oversized cargo with a large weight, so all restrictive measures related to non-standard transportation of goods must be observed here.

      As for the rigging of the minting press, its fastening on a mobile cargo platform and the nature of the use of lifting mechanisms when loading on low-frame platforms or trawls depends on its weight and linear dimensions, the state of the roadway along which the minting press will be transported and other factors affecting the safety of equipment during movement.

      The carrier undertakes to issue travel documents and special transportation permits.

      Installation of the coinage press

      Installation of the coinage press

      At the point of installation, the minting press equipment is released from containers and packaging, and the units and mechanisms prepared for storage are subject to deconservation and thorough wipe.

      By means of visual control, the absence of defects, porcelain bushings on the primary output contacts are checked, air dehumidifiers, oil filters, liquid indicators are checked, the integrity of the seals of the manufacturer is checked.

      Identified defects are corrected during installation work.

      Setting up the minting press

      Startup of the minting press

      Start-up minting press is used to test the main characteristics of the product and its components before the start of the operational period.

      To perform commissioning works, the Customer allocates his representative authorized for the prompt resolution of organizational and technical issues.

      The list of equipment and tools necessary for carrying out the PNR is available from service engineers of Sintez TMK.

      After the start-up is completed, the machine is checked according to the Certificate of Acceptance for Conformity with Technical Specifications, after which the relevant Act on executed PPR is drawn up.

      According to the results of commissioning, the Customer is put into operation equipment corresponding to passport data.

      Regulatory documents of the minting press

      Regulatory instruments

      Regulatory documents that must be guided for dismantling, rigging, transportation and installation and commissioning of the minting press:

      GOST 5384-89 Press cold stamping crank-knee.

      GOST 12.3.009-76 “SSBT”. Loading and unloading work. General safety requirements”

      Guide to fastening technological equipment with foundation bolts (CH 471-75)

      GOST 24379.0-2012.Basic bolts. General technical specifications.

      SNIP 3.05.05-84 Technological equipment and technological pipelines

      VSN 362-87 Manufacturing, installation and testing of process pipelines up to 10 MPA

      HSN 70-79 Instructions for installation and testing of pipelines with a diameter of a conditional passageway up to 400 mm inclusive at a pressure above 9.8 to 245 MPA

      SN 527-80 Instructions for the design of steel pipelines up to 10 MPA

      GOST 21.401-88 System of project documentation for construction. Production technology. Basic requirements for working drawings

      Collection E26 Installation of technological pipelines

      We will professionally rigging the minting press in Moscow and the Moscow region, we also have partners in All Russia and the CIS countries, and will dismantle the minting press, install the foundation for the minting press, implement maintenance of the minting press and its modernization.

       