    • Installation of steel pipes of various diameters is carried out in the process of construction, overhaul and reconstruction of industrial and civil facilities. Steel pipes today can be used in construction in various ways, but their main application is the construction of pipelines to move substances in a liquid or gaseous state.

      Thus, the installation of pipelines from steel pipes is carried out taking into account the future purpose of the system and has its own characteristics in each case. Installation of steel pipes is a time-consuming process that requires the executor to have resources and workers with a certain classification and experience, welders, installers, engineers.

      In particular, steel pipes are used for construction: 

      • Water pipes;
      • The heat train;
      • Steam lines;
      • Gas pipelines;
      • Gas producers;
      • Oil pipelines;
      • Oil pipelines;
      • Starch pipes;
      • Adhesives;
      • Milk conduits;
      • Oil pipelines and other facilities.

      Company Synthesis TMK. It specializes in the installation of steel pipes with a diameter of 100 millimeters, which are actively used in the construction of technological pipelines, heating, water supply and storm sewage systems. In addition, the company Synthesis TMK. provides services for the installation of stainless steel pipelines, which are actively used in the food, chemical, oil, industry.
      Order a service for the installation of steel pipelines.

        • Term of work from 10 (ten) working days.
        • We reduce the cost of installation of steel pipelines to 20%.
        • Contact by phone or send an application by e-mail.

      Industrial or technological pipelines differ from the domestic use of various materials, as well as the difference in the environment (pressure, temperature, transferred substances) in which the pipelines operate.

       

      Design and installation of pipework

      Installation of industrial and technological pipelines begins with the preparation of the project at the working documentation stage, then the development of the work production project (PPR), without which production and installation are almost impossible. When working on this document, the company’s specialists Synthesis TMK. pay attention to the technological layout of the building in which the pipeline will be located, the points of connection of the pipeline to existing engineering networks, take into account free capacities, mechanization facilities, sites for storing materials.

      Also, the company’s engineers study in detail the passports received from the customer for the equipment, which subsequently avoids problems during the installation of technological equipment and pipelines. Already at this stage, taking into account the pressure and temperature of the future pipeline, thermal elongations are calculated and compensatory measures are provided that will allow the system to function properly.
      For example, the installation of steam and hot water pipelines should take into account the physical properties of the metal from exposure to high temperatures, and the installation of technological equipment and pipelines in the chemical industry should take into account the features of the working environment of the transported substances.
      When designing and installing, we take into account the working environment of future pipelines, which guarantees their long service without breakdowns.

       

      Manufacture of technological pipework

      After drawing up the PRP and its approval, the company’s specialists begin the direct installation of the pipeline. The parts themselves (pipes, valves, flanges, fasteners) are delivered to the site ready-made, and work is carried out on the site such as cutting steel pipe, welding, large-assembly. During the installation of the system, ready-made taps of 45 or 90 degrees are used. When installing horizontal pipelines, the presence of slopes is taken into account, thanks to which it will be possible to completely remove liquid or condensate from the system, for this purpose, pressure gauges and trigger cranes are installed at different ends of the structure.
      In general, as part of the laying of pipelines, the specialists of the company Synthesis TMK. carry out such activities as:

          • earthworks during installation of external pipelines;
          • Installation and installation of steel and stainless pipes;
          • Installation of closure valves and safety valves;
          • Installation and installation of shaped parts in places of connections;
          • Carrying out welding works;
          • Installation of allotments to equipment;
          • Conducting anticorrosion treatment;
          • Connection of the pipeline to engineering networks;
          • Installation of equipment adjacent to the pipeline;
          • Installation of mobile and fixed supports;
          • Production and installation of compensators;
          • Configuring the support and suspension system of pipelines;
          • Conducting tests.

      Installation of technological pipelines is carried out in accordance with the requirements of SNiP, SP, PB, VSN, GOST and other regulatory documents.

      As a rule, works on the design and installation of pipelines are carried out during construction works at the facility, and the prices for the installation of steel pipes are determined by the set of necessary works, as well as the complexity of the work carried out. The price is always calculated individually. Also, when installing pipelines, ready-made schemes are often used, which allows you to perform work faster.

       

      Conduct of tests

      After the pipeline is connected to the equipment, the installation organization conducts tests. The system starts with a pressure of 1.5 from the operating index, which allows you to identify possible leaks and other problems. If during the tests everything works normally, the pressure level has not changed over time, the certificate of acceptance of tests is signed. Pipeline installation and repair organizations often neglect testing, which can lead to unforeseen situations and even tragedy.
      We are confident in the quality of services provided and provide a guarantee for the work performed for 2 years.

      Company Synthesis TMK. He has extensive experience in the installation of steel pipes, our specialists have all the necessary documents confirming their high qualification, and the quality of services we confirm, providing a statutory guarantee for all work performed.

       

      Normative documents

          • SNIP 3.05.04-85 “Installation of pipelines”
          • SNIP 3.05.01-85 "Internal sanitary and technical systems"
          • PB 10-573-03 Rules for the design and safe operation of steam and hot water pipelines
          • PB 03-585-03 Rules of design and safe operation of process pipelines
          • VSN 005-88 "Construction of steel pipelines". Technology and organization
          • VSN 2-149-82 "Instructions for the production of works in the construction of main steel pipelines"
          • GOST 14911-82 "Details of steel pipelines". The supports are moving. Types and basic dimensions”
          • GOST 16127-70 "Details of steel pipelines". Suspension. Types and basic dimensions”
          • GOST 22130-86 "Details of steel pipelines". The supports are movable and pendants. Technical specifications”
          • GOST 16037-80 "Combinations of welded steel pipelines". Principal types, structural elements and dimensions”
          • SNIP 2.04.12-86 "Calculation for the strength of steel pipelines"
          • SNiP I-D.4-62 "Steel main pipelines". Materials and articles”