ENRU中文
+7 (985) 763-88-72
+7 (499) 750-07-87

Working hours: 9:00 to 19:00

info@sinteztmk.ru

Serving Moscow and the Moscow Region

Инжиниринговые услуги в Москве. Наладка и демонтаж оборудования. Синтез ТМК

    By clicking "send" you agree to the privacy policy

    I give consent to the processing of personal data



    • Design and fill in 45 days

      Order the design of a steel or concrete foundation under equipment that will withstand the statistical and dynamic loads. Pour the base into according applicable building regulations and GOST: it will extinguish concussions, tremors, blows and vibrations.

      We’ll do the work in 1.5 months — We conclude a contract, so we guarantee compliance with the deadlines. Experience with 1960 — implemented 270 Projects, look. portfolio »

      Foundations for equipment for machines, presses, scales, lines, hammers, conveyors and manufacturing-centres

      • Фундамент под оборудование
        Фундамент под оборудование
      • Фундамент под оборудование цеха
        Фундамент под оборудование цеха
      • Фундамент под технологическое оборудование
        Фундамент под технологическое оборудование
      • Фундамент под технологическое оборудование цеха
        Фундамент под технологическое оборудование цеха
      • Фундамент под станок
        Фундамент под станок
      • Фундамент под оборудование
        Фундамент под оборудование
      • Фундамент под оборудование цеха
        Фундамент под оборудование цеха
      • Устройство котлована для фундамента под оборудование
        Устройство котлована для фундамента под оборудование
      • Проект фундамента под станок
        Проект фундамента под станок
      • Проект фундамента под оборудование
        Проект фундамента под оборудование
      • Изготовление фундамента под технологическое оборудование
        Изготовление фундамента под технологическое оборудование

      Strong foundations for equipment from high-grade concrete 60.

      Guarantee for 3 year
      Rest assured as a foundation for technological equipment — The building will protect the building and drive-by loads. If you notice a defect. — fix it for free.

      Compliance with deadlines
      Accept the object in 40.–45 days after treatment our company. We perform the design and base-filling equipment on time Considered logistics and experience

      Information on work
      Find out about project implementation moment — answer all related matters. If necessary — Prepare a photo report with explanations and We’ll send it to you. 1–2 days

      Integrated design and Filling foundations for equipment: we will perform all the necessary work

      1. Za. 1–3 days of testing and Measurements, set up a task for design and fabrication.
        We’ll need the following data. — technological layout of the building, points of connection to networks, information about the availability of free capacity, information about ground groundwater, passports on mountable equipment.
      2. After the approval of the project, we will develop an RPG. All calculations will be performed by a computer program. — Errors ruled out. In designing and The best manufacturing practices are applied.
      3. If necessary, remove and Remove the old foundation from With the help of jackhammers or diamond cutting.
      4. Let’s get to construction — We will prepare the pit (vibro- and waterproofing, collect the frame of the foundation and Formwork, pour concrete, install mortgaged parts. When the base scores 70 Percentage of required strength — We’ll install the equipment.
      5. We’ll run tests and Laboratory measurements to check the quality of the foundation. Only then will we deliver the object to exploitation.

      In designing and Filling foundations for equipment we observe:

      • SP 26.13330.2012 «Fundamentals of machines with dynamically»
      • GOST R 54257-2010 Reliability of building structures and grounds. Basic provisions and requirement
      • GOST 12.1.012-2004 SSBT. Vibrational safety. General requirements
      • GOST 25100-95 Grounds. Classification
      • SP 16.13330.2011 «Steel structures»
      • SP 20.13330.2011 «Loads and impact»
      • SP 22.13330.2011 «Foundations of buildings and facilities»
      • SP 24.13330.2011 «Pile foundations»
      • SP 25.13330.2012 «Grounds and foundation frozen»
      • SP 28.13330.2012 «Protection of construction structures from corrosion»
      • SP 43.13330.2012 «Construction of industrial enterprises»
      • SP 63.13330.2012 «Concrete and reinforced concrete structures. Basic provisions»



        Free consultation


        By clicking "send" you agree to the privacy policy

        I give consent to the processing of personal data

      Top
      ×