
-
Design and fill in 45 days
Order the design of a steel or concrete foundation under equipment that will withstand the statistical and dynamic loads. Pour the base into according applicable building regulations and GOST: it will extinguish concussions, tremors, blows and vibrations.
We’ll do the work in 1.5 months — We conclude a contract, so we guarantee compliance with the deadlines. Experience with 1960 — implemented 270 Projects, look. portfolio »
Foundations for equipment for machines, presses, scales, lines, hammers, conveyors and manufacturing-centres
1 day budgeting —
Find out the cost of the foundation for the equipmentStrong foundations for equipment from high-grade concrete 60.
Integrated design and Filling foundations for equipment: we will perform all the necessary work
- Za. 1–3 days of testing and Measurements, set up a task for design and fabrication.
We’ll need the following data. — technological layout of the building, points of connection to networks, information about the availability of free capacity, information about ground groundwater, passports on mountable equipment. - After the approval of the project, we will develop an RPG. All calculations will be performed by a computer program. — Errors ruled out. In designing and The best manufacturing practices are applied.
- If necessary, remove and Remove the old foundation from With the help of jackhammers or diamond cutting.
- Let’s get to construction — We will prepare the pit (vibro- and waterproofing, collect the frame of the foundation and Formwork, pour concrete, install mortgaged parts. When the base scores 70 Percentage of required strength — We’ll install the equipment.
- We’ll run tests and Laboratory measurements to check the quality of the foundation. Only then will we deliver the object to exploitation.
In designing and Filling foundations for equipment we observe:
- SP 26.13330.2012 «Fundamentals of machines with dynamically»
- GOST R 54257-2010 Reliability of building structures and grounds. Basic provisions and requirement
- GOST 12.1.012-2004 SSBT. Vibrational safety. General requirements
- GOST 25100-95 Grounds. Classification
- SP 16.13330.2011 «Steel structures»
- SP 20.13330.2011 «Loads and impact»
- SP 22.13330.2011 «Foundations of buildings and facilities»
- SP 24.13330.2011 «Pile foundations»
- SP 25.13330.2012 «Grounds and foundation frozen»
- SP 28.13330.2012 «Protection of construction structures from corrosion»
- SP 43.13330.2012 «Construction of industrial enterprises»
- SP 63.13330.2012 «Concrete and reinforced concrete structures. Basic provisions»
- Za. 1–3 days of testing and Measurements, set up a task for design and fabrication.
