
-
Design and installation of crane monorail tracks for 2 telfers with a carrying capacity of 5 tons at the Knauf GIPS company
Address: Moscow Region, Krasnogorsk, str. Central, 139.
Features: The work was done in an existing company. The fastening of the crane paths is made to the lower belt of bearing farms. Electric Demag EK DR – Pro 5-4 4/1-10 Z-6/1-380-02-50
Start of work: May 2016.
End of work: August 2016.
