      When connecting the collected equipment to existing engineering networks and communications, it is required to obtain technical specifications for the insert, taking into account the specific characteristics of the object and changes in loads in connection with its commissioning.

      The owner of the networks indicates the point at which the connection will be performed, as well as the order of connection, the maximum possible parameters. Further along the construction site to the connected equipment, the laying of communications is organized by the developer or investor.

      Preliminary calculation of costs for insertion into engineering networks is made on the basis of the technical conditions obtained, a feasibility study and justification of all works are compiled. The initial data for the calculations are the planned load and consumption of the working substance at the facility, the location of the object near the passage of engineering networks and highways.

      The technical specifications include information on the location and characteristics of connection points to networks, the possibility of increasing the load in them, restrictions on the timing of connection work and on the effect of TU. The tariff for insertion into engineering networks may be indicated, but it is determined on the date of receipt of the TU and is valid until the specified date.

      On the basis of a study on the needs of the construction site in communications and supplies of water, electricity, the couple receives an opinion on engineering support and preliminary technical conditions are issued.

       

      Coordination and receipt of TU for connection to engineering networks

      When connecting to the municipal networks of the city, there are a number of requirements introduced in the technical conditions. Without obtaining this document, it is impossible to perform work on the organization of providing the facility with electricity, heat, water. The list of required TU documents may vary from region to region depending on the network owner and service provider. At the same time, the title documents of the developer, data on the establishment of the boundaries of the construction site, permits for land and construction, a list of resources necessary for connecting, the size of the required maximum load, an application for connection are necessarily attached.

      After the technical possibility of connecting to the necessary networks is checked, the service provider develops and agrees on the technical conditions for joining the engineering networks. They indicate the input points and design loads in them, the timing of connection.