Transportation and installation of boiler modules is carried out in thermal power plants, these are stations for generating electricity received during the transformation of thermal energy into its electrical form.
The principle is quite simple: using the energy of the burned fuel, generator devices produce an electric current. The heat produced is used to heat certain sources of consumption.
The development of this subtype of energy was due to the high total efficiency of heat and electricity generated, which in optimal designs reaches 80-85%.
The advantages of such small industrial stations, in addition to a high efficiency factor, are the reliability, compactness and mobility of installations, the installation of boiler modules of which is carried out at the site of installation and use.

Dismantling boiler modules
The following main activities are required for the dismantling of the steam boiler:
To carry out these technological operations, we use the necessary locksmith tools and rigging devices (if necessary).- Stop supplying cold water;
- Disconnect the gas pipeline;
- Stop functioning of the smoke removal complex.

Calculation of boiler modules
The upcoming transportation of steam boilers is carried out using large-sized equipment, low-frame sites, trawls using various types of rigging equipment during loading and unloading operations.
Such transportation is classified as the transportation of bulky goods, and is subject to the necessary safety measures and restrictions in the transportation of steam boilers.

Installation of boiler modules
Installation work on the assembly and completion of the necessary control complexes in containers is carried out at the factory – manufacturer.
After the transportation of boiler modules and unloading works on the site for their installation, a set of works is carried out, including rigging activities.
Before installation of steam boilers:
When installing steam boilers of sectional type, a large amount of activities is devoted to the transportation of products in horizontal and vertical displacement, i.e. with the use of rigging devices, primarily portal lifts, cranes and cranes.- inspection of surfaces from inside and outside is carried out, the condition of the interior partition, all pipelines is checked;
- parameters and linear dimensions of blocks and their elements are tested in accordance with the drawings, as well as their completeness;
- According to a similar scheme, block elements are accepted without walling and plating.

Regulatory instruments
Regulatory documents that must be guided for dismantling, rigging, transportation and installation and commissioning of the transformer:
GOST 12.3.009-76 “SSBT”. Loading and unloading work. General safety requirements”
Guide to fastening technological equipment with foundation bolts (CH 471-75)
GOST 24379.0-2012.Basic bolts. General technical specifications.
SNIP 3.05.05-84 Technological equipment and technological pipelines
VSN 362-87 Manufacturing, installation and testing of process pipelines up to 10 MPA
SN 527-80 Instructions for the design of steel pipelines up to 10 MPA
Collection E26 Installation of technological pipelines
We will professionally produce rigging of boiler modules in Moscow and the Moscow region, we also have partners in All Russia and CIS countries, and will dismantle boiler modules, install the foundation for boiler modules, implement the maintenance of boiler modules.